Description
GE General Electric Technical Specifications: IS200TRPLH1A
It is generally desirable for a system operator to maintain the power factor as close to unity as possible to min
IS200TRPLH1A imize both costs and voltage excursions. Since the power factor is variable on common non-dedicated circuits,
it is advantageous to compensate for low (lagging) power factor values by connecting a capacitor bank to the
circuit when required. The relay allows two stages of capacitance switching for power factor compensation.
brand | Product Name | Product model | Order No |
GE Fanuc | Module card | IS200TRPLH1A | nothing |
Place of Origin | Marketable land | Imported or not | defects liability period |
Europe and America | Nationwide and overseas | yes | a year |
Place of shipment | Delivery method | How to use | Applicable industries |
Xiamen | Shunfeng Express | Commissioning and installation | Power Plant Steel Plant Cement Plant Shipboard Papermaking |
Service advantages | Foreign import, goods preparation and supply | Reasonable price and reliable quality | Pictures are for reference only |
Product features | Primary source of goods, supply by model | After sales guarantee | Chen 1810693-7731 |
Two independent elements are available for monitoring power factor, POWER FACTOR 1 and POWER FACTOR 2,
IS200TRPLH1A each having a pickup and a dropout level. For each element, when the measured power factor becomes more
lagging than the pickup level (i.e. numerically less than), the relay will operate a user-selected output contact.
This output can be used to control a switching device which connects capacitance to the circuit, or to signal an
alarm to the system operator. After entering this state, when the power factor becomes less lagging than the
power factor dropout level for a time larger than the set delay, the relay will reset the output contact to the non
operated state.
Both POWER FACTOR 1 and 2 features are inhibited from operating unless all three voltages are above 30% of
IS200TRPLH1A nominal and one or more currents is above 0. POWER FACTOR 1 and 2 delay timers will only be allowed to time
when the 30% threshold is exceeded on all phases and the power factor remains outside of the programmed
pickup and dropout levels. In the same way, when a power factor condition starts the POWER FACTOR 1 or 2
delay timer, if all three phase voltages fall below the 30% threshold before the timer has timed-out, the element
will reset without operating. A loss of voltage during any state will return both POWER FACTOR 1 and 2 to the
reset state.
Why are the prices of many products of our company more competitive?
(1) Source purchase to reduce the price difference in the intermediate phase
(2) Stable channel and more guaranteed supply
Lead time problem
(1) For the spot products in stock, the de
livery can be arranged on the same day after the contract payment is signed
(2) Order products and deliver according to the quoted delivery date
Xiamen Xiongba adheres to the enterprise philosophy of “improving the value of spare parts supply chain”,
For the simple purchase procedure of spare parts, ensure that they are delivered to the site in a timely manner, and help users reduce the risk of downtime caused by the shortage of spare parts
The emergency spare parts support service is complete, and the user can customize the spare parts. The quality of the spare parts is reliable. All the spare parts provided enjoy a one-year super long warranty
Spot stock, fast response, reduce user capital investment, improve spare parts utilization, spare parts replacement!
Details: If you need urgent delivery orders, please feel free to contact us, and we will try our best to meet your needs.
Price problem: If you find that other suppliers offer cheaper prices for the same product, we are also willing to provide you with reference prices and give you further discounts.
Contact us:+86 181 0693 7731
Mail: 2872270648@qq.com
Contact: Chen