Description
GE General Electric Technical Specifications: IS200TRLYH1BGF
IS200TRLYH1BGF Controllers are an alternative to BIMs – and
are used where distributed control is required,
rather than distributed IO. A number of
different Controllers are available which
are suited to particular applications. The
Logic Controller runs IS200TRLYH1BGF applications based on
IEC61131 languages, the Process Controller
has a control package that uses DCS-style
function blocks and the Hybrid Controller can
run both application packages in a single unit.
The SafetyNet Controller is SIL 2 compliant
for emergency shut-down and fre and gas
applications. The RTU Controller runs IEC61131
application programmes and supports DNP3
communication protocol.
brand | Product Name | Product model | Order No |
GE Fanuc | Module card | IS200TRLYH1BGF | nothing |
Place of Origin | Marketable land | Imported or not | defects liability period |
Europe and America | Nationwide and overseas | yes | a year |
Place of shipment | Delivery method | How to use | Applicable industries |
Xiamen | Shunfeng Express | Commissioning and installation | Power Plant Steel Plant Cement Plant Shipboard Papermaking |
Service advantages | Foreign import, goods preparation and supply | Reasonable price and reliable quality | Pictures are for reference only |
Product features | Primary source of goods, supply by model | After sales guarantee | Chen 1810693-7731 |
The use of ‘smart’ instruments on process
IS200TRLYH1BGF plants is growing but this investment is not
always fully exploited. Whether it is for a new
installation, or the upgrade of an existing
one, we have solutions that provide the
connections between the HART field instru
ments, the control systems and the asset
management software.
Specifically, the PAC8000 Process I/O system
has been designed to be transparent to
HART signals, thus allowing the host control
software and any HART field instruments to
communicate directly with each other.
In addition, PAC8000’s HART connection
system provides on-line access from a PC to
the HART field devices for monitoring device
performance. HART devices may be selected
for regular status monitoring and alerts can
be issued if the status changes. The benefits
from this approach are:
- Reduced commissioning time and cost
- Reduced process downtime through status
monitoring
- Lower loop maintenance costs by using
field device diagnostics
Why are the prices of many products of our company more competitive?
(1) Source purchase to reduce the price difference in the intermediate phase
(2) Stable channel and more guaranteed supply
Lead time problem
(1) For the spot products in stock, the de
livery can be arranged on the same day after the contract payment is signed
(2) Order products and deliver according to the quoted delivery date
Xiamen Xiongba adheres to the enterprise philosophy of “improving the value of spare parts supply chain”,
For the simple purchase procedure of spare parts, ensure that they are delivered to the site in a timely manner, and help users reduce the risk of downtime caused by the shortage of spare parts
The emergency spare parts support service is complete, and the user can customize the spare parts. The quality of the spare parts is reliable. All the spare parts provided enjoy a one-year super long warranty
Spot stock, fast response, reduce user capital investment, improve spare parts utilization, spare parts replacement!
Details: If you need urgent delivery orders, please feel free to contact us, and we will try our best to meet your needs.
Price problem: If you find that other suppliers offer cheaper prices for the same product, we are also willing to provide you with reference prices and give you further discounts.
Contact us:+86 181 0693 7731
Mail: 2872270648@qq.com
Contact: Chen