MMS3120/022-000 EPRO Module in stock

MMS3120/022-000 is a dual channel bearing vibration monitoring transmitter from Emerson EPRO’s MMS3000 series, designed specifically for vibration monitoring and protection of industrial rotating equipment. It is widely used in industrial environments such as power plants, refineries, and chemical plants.

Category: Tags:
Whatsapp:+86 13313705507
WeChat:+86 13313705507
E-mail:geabbdcs@gmail.com
E-mail:info@geabb.com
Contacts:KEN HE

Description

  1. Power Supply Wiring

Rated Power Supply: Connect the auxiliary power supply to terminals L (phase) and N (neutral) as specified in the product datasheet. Ensure the supply voltage matches the rated range (typically 110–240 V AC, 50/60 Hz; confirm via ABB official manual).

Polarity Note: Observe correct wiring of L and N to avoid device malfunction. Use copper conductors with cross-sectional area 1.0–2.5 mm² (stranded or solid) based on installation environment.

  1. Motor Connection (Current Sensing)

CT Wiring: Connect secondary windings of current transformers (CTs) to terminals I1, I2 (Phase 1), I3, I4 (Phase 2), I5, I6 (Phase 3). Ensure CT ratio (e.g., 50/5 A, 100/5 A) is compatible with the relay’s current range (refer to ABB technical specifications).

Polarity Alignment: Match CT polarity marks (e.g., “P1″/”S1”) with relay terminal labels to ensure accurate current measurement. Do not open CT secondary circuits when energized to prevent dangerous voltage buildup.

3-Phase Wiring: For 3-phase motor protection, wire all three phases; single-phase applications require appropriate CT configuration as per ABB guidelines.

  1. Control Signal Wiring

Trip Outputs: Terminals NO1/NC1 (Normally Open/Normally Closed) and NO2/NC2 serve as trip outputs. Connect to contactors or circuit breakers for motor shutdown. Use 1.0–1.5 mm² conductors, and ensure output contact rating (AC-15: 250 V AC, 5 A; confirm via ABB datasheet) matches the load.

Control Inputs: Terminals DI1–DI4 (Digital Inputs) support external control signals (e.g., start/stop commands, remote reset). Wire to auxiliary contacts of control buttons or PLC outputs, with input voltage compatible with the relay’s digital input range (e.g., 24 V DC, 110 V AC).

Signal Integrity: Keep control wiring separate from power cables to minimize electromagnetic interference (EMI). Use shielded cables for long-distance runs, grounding the shield at one end.

  1. Communication Wiring (If Equipped)

Bus Connection: For models with communication 功能 (e.g., Modbus RTU, Profibus DP), wire the communication bus to terminals COM+, COM- (Modbus) or corresponding Profibus terminals. Follow ABB’s bus wiring guidelines for termination resistors (120 Ω) at bus endpoints.

Cable Specifications: Use twisted-pair shielded cable (e.g., CAT5e for Modbus, Profibus-specific cable) with cross-sectional area 0.6–1.0 mm². Maintain bus length within limits specified in ABB’s communication manual (e.g., Modbus RTU: up to 1200 m at 9600 baud).

  1. Grounding Requirements

Protective Earth (PE): Connect the relay’s PE terminal (marked ) to the system’s protective earthing conductor (cross-sectional area ≥ 2.5 mm² for copper) to ensure electrical safety and noise suppression.

Functional Ground: For communication and signal circuits, implement functional grounding as per ABB’s EMC (Electromagnetic Compatibility) recommendations to enhance system stability.

  1. Wiring Safety & Best Practices

Insulation Check: Perform insulation resistance testing (≥ 1 MΩ at 500 V DC) on all wiring before energizing the device.

Torque Specifications: Tighten terminal screws to 0.8–1.2 N·m (confirm via ABB manual) to prevent loose connections and overheating.

Compliance: Adhere to IEC 60947, NFPA 79, and local electrical codes during installation. Refer to ABB’s MMS3120 series installation guide for country-specific requirements.

Labeling: Clearly label all wires with terminal numbers and signal descriptions for maintenance convenience, consistent with ABB’s documentation standards.

♦♦…♦♦…♦♦…♦♦…♦♦…♦♦…♦♦…♦♦…♦♦…♦♦…♦♦…♦♦…♦♦…♦♦…♦♦…♦♦…♦♦…♦♦…♦♦…♦♦…♦♦…♦♦…♦

Shipping:
1. Your item will be shipped to all countries via EMS, unless one country cannot be shipped via EMS. We will choose DHL, UPS, or FedEx. Please leave us your phone number.
2. We will ship the product to you on the same day or within 1-2 working days after receiving your payment. The shipping time depends on the country/region where you reside, the customs and habits of your country/region, and especially during peak hours.
3. Assuming (assuming) that the item requires payment of tariffs from your country, the buyer is obligated. We are not responsible for any taxes or customs fees in your country/region.

Return Policy:
1. Please contact us before returning the item.
2. The buyer should inform the seller of all returned items within 7 days after receiving the package. We reserve the right to reject any request to inform the seller for more than 7 days.
3. Returned products must have all original packaging and be in good condition.

Response policy:
If you are satisfied with the purchase, please leave us an active response.
2. If you have any questions about the outcome of the transaction or product, please contact us first and we will do our best to satisfy you!
3. Please do not reply with negative feedback before contacting us!

More models available:

DS200CTBAG1ADD

9905-263

5233-2089

IC8008SI228RD2

8237-1006

5233-2089

8446-1019

EASYGEN-3500-5/P2 8440-2145

9905-017

8200-314