TMEIC 5D3A1118P031 ARND-3120A Drive Unit Installation Procedure
Pre-Installation Requirements
-
Environmental Verification
- Ambient Temp: 0-45°C (Derate 2%/°C >40°C)
- Humidity: <85% RH (non-condensing)
- Pollution Degree: 2 per IEC 60664
-
Power Preparation
- Input Voltage: 3-phase 200-230VAC ±10%
- Short-Circuit Capacity: ≥35kA at 480V
- Grounding: ≤0.1Ω (Use 10mm² min copper conductor)
Mechanical Installation
| Step | Action | Technical Specification |
|---|---|---|
| 1 | Mount baseplate | • Surface flatness: ≤0.2mm/m² • M10 anchor bolts (4 places) • Torque: 80 Nm ±5% |
| 2 | Install cooling fins | • Thermal paste: Dow Corning TC-5625 • Contact pressure: 15kPa min |
| 3 | Secure drive unit | • Vibration limit: 4.9m/s² (ISO 10816-3) • Clearance: ≥100mm top/bottom |
| 4 | Connect conduit | • NPT 3/4″ sealed entry • Bend radius: ≥6× conduit OD |
Electrical Wiring
PINOUT ARND-3120A TERMINAL BLOCK
┌────────┬───────────────────┬─────────────┐
| Term | Function | Cable Spec |
├────────┼───────────────────┼─────────────┤
| R/L1 | Line Phase 1 | 4AWG THHN |
| S/L2 | Line Phase 2 | 4AWG THHN |
| T/L3 | Line Phase 3 | 4AWG THHN |
| U | Motor Phase 1 | 8AWG shielded|
| V | Motor Phase 2 | 8AWG shielded|
| W | Motor Phase 3 | 8AWG shielded|
| +1/-1 | DC Bus link | 25mm² flex |
| DG/PE | Earth ground | 10AWG green |
└────────┴───────────────────┴─────────────┘
Critical Note: Maintain 300mm separation between power/control cables. Cross at 90° if overlap occurs.
Control Connections
Path: TERMINAL BOARD X3
• TB1: 24VDC Logic Power (Fused @ 5A)
• TB2: Mechatrolink-III Comm (DA-31015A cable)
• TB3: Analog Input (0-10VDC / 4-20mA jumper-selectable)
• TB4: Safety Torque Off (STO) - Dual-channel NC
Post-Installation Checks
-
Insulation Test
- DC 1000V megger test: ≥100MΩ (phase-to-ground)
Disconnect electronics before testing
- DC 1000V megger test: ≥100MΩ (phase-to-ground)
-
Rotation Verification
- Jog command (FWD/REV) via TMEC-View software
- Confirm motor rotation matches mechanical load
-
Cooling System
- Airflow: ≥0.5m³/min at 200Pa static pressure
- Delta-T: ≤15°C (inlet vs. heatsink)
Commissioning Documentation
| Form | Reference Standard |
|---|---|
| Installation Checklist | TMEIC FORM A-3381 Rev.4 |
| Torque Audit Record | JIS B 1081 Class 8.8 |
| Grounding Certificate | IEEE 142-2007 Section 4 |
5D3A1118P031 ARND-3120A TMEIC PDF
♦…♦♦…♦♦…♦♦…♦♦…♦♦…♦♦…♦♦…♦♦…♦♦…♦♦…♦♦…♦♦…♦♦…♦♦…♦♦…♦♦…♦♦…♦♦…♦♦…♦♦…♦♦…♦♦…♦
Shipping:
1. Your item will be shipped to all countries via EMS, unless one country cannot be shipped via EMS. We will choose DHL, UPS, or FedEx. Please leave us your phone number.
2. We will ship the product to you on the same day or within 1-2 working days after receiving your payment. The shipping time depends on the country/region where you reside, the customs and habits of your country/region, and especially during peak hours.
3. Assuming (assuming) that the item requires payment of tariffs from your country, the buyer is obligated. We are not responsible for any taxes or customs fees in your country/region.
Return Policy:
1. Please contact us before returning the item.
2. The buyer should inform the seller of all returned items within 7 days after receiving the package. We reserve the right to reject any request to inform the seller for more than 7 days.
3. Returned products must have all original packaging and be in good condition.
Response policy:
If you are satisfied with the purchase, please leave us an active response.
2. If you have any questions about the outcome of the transaction or product, please contact us first and we will do our best to satisfy you!
3. Please do not reply with negative feedback before contacting us!
More models available: